{"id":7258,"date":"2026-02-17T13:27:19","date_gmt":"2026-02-17T12:27:19","guid":{"rendered":"https:\/\/openbim-knowledgebase.org\/docs\/standard-aia-2026\/foreword\/"},"modified":"2026-02-20T16:53:20","modified_gmt":"2026-02-20T15:53:20","slug":"foreword","status":"publish","type":"docs","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/","title":{"rendered":"Foreword"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Foreword on handling<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. <\/p>\n\n<p class=\"wp-block-paragraph\">Just like the first edition (2019) of the buildingSMART Austria AIA, the wording used is that of an integral part of a contract.<br\/>The authors would like to point out at this point that this specific AIA guide is not intended to explain or teach openBIM as a method. The task of this AIA guide is to break down and present the complexity of an openBIM project as far as possible so that the extensive normative specifications and standards, as well as requirements and processes, can be applied and implemented in real projects. The experience and knowledge gained by the authors in projects carried out since 2019 have been incorporated into this AIA guide, as have new developments that the authors believe will shape future openBIM projects.  <\/p>\n\n<p class=\"wp-block-paragraph\">In order to present the contents of this AIA guide in a comprehensible manner with regard to the context, implementation in the project and background, information boxes (marked in blue) are placed at the beginning of individual chapters. These information boxes are to be regarded as assistance from the authors and are not part of an AIA. If these instructions are reused, these information boxes are not part of the rules and regulations, as they represent the individual opinion or assistance of the authors.  <\/p>\n\n<p class=\"wp-block-paragraph\">Information marked in the document with the <mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-theme-palette-2-color\">text color turquoise<\/mark> must be actively adapted in the projects according to your own specifications.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Copyright<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">These AIA instructions were created by buildingSMART Austria as a basis for openBIM projects and are freely accessible, but their further use is subject to the Creative Commons license (see imprint).<\/p>\n\n<div class=\"wp-block-group has-theme-palette-7-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\">Publication from Krischmann, T., Malzer, W.: <em>buildingSMART Austria Standard-AIA<\/em>. Edition 2026. <\/p>\n\n\n<div class=\"rcp_restricted rcp_paid_only\"><p>Download der Standard-AIA nur f\u00fcr Mitglieder<\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Status: 17.02.2026<\/p>\n<\/div><\/div>\n","protected":false},"featured_media":0,"parent":6845,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","_is_vendor_doc":"0","footnotes":""},"doc_tag":[],"class_list":["post-7258","docs","type-docs","status-publish","hentry"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Foreword on handling The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. Just like the\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"jdsuO6IAKQT7AdnTfoa5E7sI8v5dqiUpWHZIcfLmyLg\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"openBIM KnowledgeBase \u2023 Die Plattform f\u00fcr openBIM Wissen\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Foreword \u2023 openBIM KnowledgeBase\" \/>\n\t\t<meta property=\"og:description\" content=\"Foreword on handling The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. Just like the\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-02-17T12:27:19+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-02-20T15:53:20+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Foreword \u2023 openBIM KnowledgeBase\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Foreword on handling The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. Just like the\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/foreword\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#listItem\",\"position\":1,\"name\":\"KnowledgeBase\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/#listItem\",\"name\":\"Standard AIA 2026\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/#listItem\",\"position\":2,\"name\":\"Standard AIA 2026\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/foreword\\\/#listItem\",\"name\":\"Foreword\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#listItem\",\"name\":\"KnowledgeBase\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/foreword\\\/#listItem\",\"position\":3,\"name\":\"Foreword\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/#listItem\",\"name\":\"Standard AIA 2026\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#organization\",\"name\":\"buildingSMART Austria\",\"description\":\"buildingSMART Austria ist eine offene Plattform, deren Ziel die Entwicklung digitaler L\\u00f6sungen in allen Sektoren des Built Environments, also \\u00fcber die gesamte Wertsch\\u00f6pfungskette und den gesamten Lebenszyklus hinweg, ist.\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"email\":\"alfred.waschl@buildingsmart.co.at\",\"telephone\":\"+43676840350100\",\"foundingDate\":\"2024-06-05\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/BuildingSMART_CMYK_Austria.jpeg\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/foreword\\\/#organizationLogo\",\"width\":2308,\"height\":425,\"caption\":\"BuildingSMART_CMYK_Austria\"},\"image\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/foreword\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/buildingsmart-austria\\\/\"],\"address\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#postaladdress\",\"@type\":\"PostalAddress\",\"streetAddress\":\"Eschenbachgasse 9\",\"postalCode\":\"1010\",\"addressLocality\":\"Wien\",\"addressCountry\":\"AT\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/foreword\\\/#webpage\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/foreword\\\/\",\"name\":\"Foreword \\u2023 openBIM KnowledgeBase\",\"description\":\"Foreword on handling The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. Just like the\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/standard-aia-2026\\\/foreword\\\/#breadcrumblist\"},\"datePublished\":\"2026-02-17T13:27:19+01:00\",\"dateModified\":\"2026-02-20T16:53:20+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"name\":\"openBIM KnowledgeBase\",\"alternateName\":\"openBIM Wissensplattform\",\"description\":\"Die Plattform f\\u00fcr openBIM Wissen\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Foreword \u2023 openBIM KnowledgeBase<\/title>\n\n","aioseo_head_json":{"title":"Foreword \u2023 openBIM KnowledgeBase","description":"Foreword on handling The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. Just like the","canonical_url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"jdsuO6IAKQT7AdnTfoa5E7sI8v5dqiUpWHZIcfLmyLg","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/#listItem","position":1,"name":"KnowledgeBase","item":"https:\/\/openbim-knowledgebase.org\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/#listItem","name":"Standard AIA 2026"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/#listItem","position":2,"name":"Standard AIA 2026","item":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/#listItem","name":"Foreword"},"previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/#listItem","name":"KnowledgeBase"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/#listItem","position":3,"name":"Foreword","previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/#listItem","name":"Standard AIA 2026"}}]},{"@type":"Organization","@id":"https:\/\/openbim-knowledgebase.org\/en\/#organization","name":"buildingSMART Austria","description":"buildingSMART Austria ist eine offene Plattform, deren Ziel die Entwicklung digitaler L\u00f6sungen in allen Sektoren des Built Environments, also \u00fcber die gesamte Wertsch\u00f6pfungskette und den gesamten Lebenszyklus hinweg, ist.","url":"https:\/\/openbim-knowledgebase.org\/en\/","email":"alfred.waschl@buildingsmart.co.at","telephone":"+43676840350100","foundingDate":"2024-06-05","logo":{"@type":"ImageObject","url":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2023\/12\/BuildingSMART_CMYK_Austria.jpeg","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/#organizationLogo","width":2308,"height":425,"caption":"BuildingSMART_CMYK_Austria"},"image":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/#organizationLogo"},"sameAs":["https:\/\/www.linkedin.com\/company\/buildingsmart-austria\/"],"address":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#postaladdress","@type":"PostalAddress","streetAddress":"Eschenbachgasse 9","postalCode":"1010","addressLocality":"Wien","addressCountry":"AT"}},{"@type":"WebPage","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/#webpage","url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/","name":"Foreword \u2023 openBIM KnowledgeBase","description":"Foreword on handling The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. Just like the","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#website"},"breadcrumb":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/#breadcrumblist"},"datePublished":"2026-02-17T13:27:19+01:00","dateModified":"2026-02-20T16:53:20+01:00"},{"@type":"WebSite","@id":"https:\/\/openbim-knowledgebase.org\/en\/#website","url":"https:\/\/openbim-knowledgebase.org\/en\/","name":"openBIM KnowledgeBase","alternateName":"openBIM Wissensplattform","description":"Die Plattform f\u00fcr openBIM Wissen","inLanguage":"en-US","publisher":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"openBIM KnowledgeBase \u2023 Die Plattform f\u00fcr openBIM Wissen","og:type":"article","og:title":"Foreword \u2023 openBIM KnowledgeBase","og:description":"Foreword on handling The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. Just like the","og:url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/","og:image":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png","og:image:secure_url":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png","og:image:width":1200,"og:image:height":630,"article:published_time":"2026-02-17T12:27:19+00:00","article:modified_time":"2026-02-20T15:53:20+00:00","twitter:card":"summary_large_image","twitter:title":"Foreword \u2023 openBIM KnowledgeBase","twitter:description":"Foreword on handling The exact requirements of a client vary depending on the type of project, its objectives and the specific agreements between the client and the contractor. For this reason, the specific framework conditions of an individual client and project-specific framework conditions could not be taken into account in this document. Just like the","twitter:image":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png"},"aioseo_meta_data":{"post_id":"7258","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"foreword","score":0,"analysis":[]},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-09-27 04:08:10","breadcrumb_settings":null,"limit_modified_date":false,"reviewed_by":null,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-02-17 12:28:01","updated":"2026-09-27 14:38:12","focus_keyword":"foreword","additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/en\/\" title=\"KnowledgeBase\">KnowledgeBase<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/\" title=\"Standard AIA 2026\">Standard AIA 2026<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\tForeword\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"KnowledgeBase","link":"https:\/\/openbim-knowledgebase.org\/en\/"},{"label":"Standard AIA 2026","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/"},{"label":"Foreword","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/foreword\/"}],"taxonomy_info":[],"featured_image_src_large":false,"author_info":[],"comment_info":0,"comment_count":0,"_links":{"self":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/7258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/types\/docs"}],"replies":[{"embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/comments?post=7258"}],"version-history":[{"count":0,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/7258\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/6845"}],"next":[{"title":"Chapter 1 - Revision status","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/standard-aia-2026\/chapter-1-revision-status\/","href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/7256"}],"wp:attachment":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/media?parent=7258"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/doc_tag?post=7258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}