{"id":4351,"date":"2024-02-06T04:32:51","date_gmt":"2024-02-06T03:32:51","guid":{"rendered":"https:\/\/openbim-knowledgebase.org\/docs\/planning-phase-2\/"},"modified":"2025-03-15T14:11:43","modified_gmt":"2025-03-15T13:11:43","slug":"planning-phase-2","status":"publish","type":"docs","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/","title":{"rendered":"Planning phase"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">This article contains the service profile of <strong>BIM project management (BPL)<\/strong> for the project phase planning phase (corresponds to LPH2 &#8211; preliminary design, LPH3 &#8211; design planning, LPH4 &#8211; submission planning to LPH5 &#8211; implementation planning according to <a href=\"https:\/\/www.arching.at\/fileadmin\/user_upload\/redakteure\/LM_VM_2014\/LM_Objektplanung_Arch_BIM_.pdf\">LM.OA.BIM<\/a>) and is basically based on the specifications of <a href=\"https:\/\/openbim-knowledgebase.org\/docs\/bimcert-lehrbuch-2024\/kapitel-4-bim-projektdurchfuehrung\/\">openBIM project implementation<\/a>.<\/p>\n<style>.wp-block-kadence-advancedheading.kt-adv-heading1912_bc3028-a7, .wp-block-kadence-advancedheading.kt-adv-heading1912_bc3028-a7[data-kb-block=\"kb-adv-heading1912_bc3028-a7\"]{margin-top:0px;margin-bottom:var(--global-kb-spacing-sm, 1.5rem);text-align:left;font-size:var(--global-kb-font-size-lg, 2rem);line-height:1.2em;font-style:normal;}.wp-block-kadence-advancedheading.kt-adv-heading1912_bc3028-a7 mark.kt-highlight, .wp-block-kadence-advancedheading.kt-adv-heading1912_bc3028-a7[data-kb-block=\"kb-adv-heading1912_bc3028-a7\"] mark.kt-highlight{font-style:normal;color:#f76a0c;-webkit-box-decoration-break:clone;box-decoration-break:clone;padding-top:0px;padding-right:0px;padding-bottom:0px;padding-left:0px;}.wp-block-kadence-advancedheading.kt-adv-heading1912_bc3028-a7 img.kb-inline-image, .wp-block-kadence-advancedheading.kt-adv-heading1912_bc3028-a7[data-kb-block=\"kb-adv-heading1912_bc3028-a7\"] img.kb-inline-image{width:150px;vertical-align:baseline;}<\/style>\n<h2 class=\"kt-adv-heading1912_bc3028-a7 wp-block-kadence-advancedheading has-theme-palette-3-color has-text-color\" data-kb-block=\"kb-adv-heading1912_bc3028-a7\">Definition of the service profile<\/h2>\n\n<p class=\"has--font-size wp-block-paragraph\">The LM.BIM 2025 service profile divides the services into <strong><a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#Erlaeuterung-optionale-Leistungen\" data-id=\"1746\" data-type=\"docs\">basic services<\/a><\/strong> and <strong><a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#Erlaeuterung-optionale-Leistungen\">optional services<\/a><\/strong> &#8211; These are summarized in one column. Optional services are declared using the <strong><a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#Erl%C3%A4uterung-LMBIM-Code\">LM.BIM code<\/a><\/strong> with the attached note &#8220;optional&#8221;. <\/p>\n<style>.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-inner-wrap{column-gap:var(--global-kb-gap-md, 2rem);row-gap:12px;}.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner{border-top:0px solid transparent;border-right:0px solid transparent;border-bottom:0px solid var(--global-palette5, #4A5568);border-left:0px solid transparent;background:var(--global-palette8, #F7FAFC);padding-top:0px;padding-right:0px;padding-bottom:0px;padding-left:0px;}.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header{border-top:1px solid var(--global-palette6, #718096);border-right:0px solid #f5f5f5;border-bottom:0px solid #f5f5f5;border-left:3px solid #f5f5f5;border-top-left-radius:0px;border-top-right-radius:0px;border-bottom-right-radius:0px;border-bottom-left-radius:0px;background:var(--global-palette7, #EDF2F7);color:var(--global-palette3, #1A202C);padding-top:var(--global-kb-spacing-xxs, 0.5rem);padding-right:0px;padding-bottom:var(--global-kb-spacing-xxs, 0.5rem);padding-left:0px;}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle )  > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle )  > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette6, #718096);}.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner, .kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner h1, .kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner h2, .kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner h3, .kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner h4, .kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner h5, .kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner h6{color:var(--global-palette3, #1A202C);}.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner a{color:var(--global-palette1, #3182CE);}.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner a:hover{color:var(--global-palette2, #2B6CB0);}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-icon-trigger{background:var(--global-palette6, #718096);}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette7, #EDF2F7);}.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header:hover, \n\t\t\t\tbody:not(.hide-focus-outline) .kt-accordion-id1912_c2fa2c-e7 .kt-blocks-accordion-header:focus-visible{color:var(--global-palette3, #1A202C);background:var(--global-palette2, #2B6CB0);border-top-color:var(--global-palette2, #2B6CB0);border-top-style:solid;border-right-color:var(--global-palette2, #2B6CB0);border-right-style:solid;border-bottom-color:var(--global-palette2, #2B6CB0);border-bottom-style:solid;border-left-color:var(--global-palette2, #2B6CB0);border-left-style:solid;}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger:before, body:not(.hide-focus-outline) .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle ) .kt-blocks-accordion--visible .kt-blocks-accordion-icon-trigger:after, body:not(.hide-focus-outline) .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle ) .kt-blocks-accordion-header:focus-visible .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette5, #4A5568);}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger, body:not(.hide-focus-outline) .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible .kt-blocks-accordion-icon-trigger{background:var(--global-palette5, #4A5568);}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger:before, body:not(.hide-focus-outline) .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible .kt-blocks-accordion-icon-trigger:after, body:not(.hide-focus-outline) .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette2, #2B6CB0);}.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible,\n\t\t\t\t.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active{color:var(--global-palette3, #1A202C);background:var(--global-palette7, #EDF2F7);border-top:1px solid var(--global-palette6, #718096);border-right:3px solid var(--global-palette7, #EDF2F7);border-bottom:0px solid #f5f5f5;border-left:3px solid var(--global-palette7, #EDF2F7);}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle )  > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle )  > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette6, #718096);}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger{background:var(--global-palette6, #718096);}.kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1912_c2fa2c-e7:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette7, #EDF2F7);}@media all and (max-width: 1024px){.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner{border-top:0px solid transparent;border-right:0px solid transparent;border-bottom:0px solid var(--global-palette5, #4A5568);border-left:0px solid transparent;}}@media all and (max-width: 1024px){.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header{border-top:1px solid var(--global-palette6, #718096);border-right:0px solid #f5f5f5;border-bottom:0px solid #f5f5f5;border-left:3px solid #f5f5f5;}}@media all and (max-width: 1024px){.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header:hover, \n\t\t\t\tbody:not(.hide-focus-outline) .kt-accordion-id1912_c2fa2c-e7 .kt-blocks-accordion-header:focus-visible{border-top-color:var(--global-palette2, #2B6CB0);border-top-style:solid;border-right-color:var(--global-palette2, #2B6CB0);border-right-style:solid;border-bottom-color:var(--global-palette2, #2B6CB0);border-bottom-style:solid;border-left-color:var(--global-palette2, #2B6CB0);border-left-style:solid;}}@media all and (max-width: 1024px){.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible,\n\t\t\t\t.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active{border-top:1px solid var(--global-palette6, #718096);border-right:3px solid var(--global-palette7, #EDF2F7);border-bottom:0px solid #f5f5f5;border-left:3px solid var(--global-palette7, #EDF2F7);}}@media all and (max-width: 767px){.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-inner-wrap{display:block;}.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-inner-wrap .kt-accordion-pane:not(:first-child){margin-top:12px;}.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-panel-inner{border-top:0px solid transparent;border-right:0px solid transparent;border-bottom:0px solid var(--global-palette5, #4A5568);border-left:0px solid transparent;padding-top:0px;padding-right:var(--global-kb-spacing-md, 2rem);padding-bottom:var(--global-kb-spacing-md, 2rem);padding-left:var(--global-kb-spacing-md, 2rem);}.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header{border-top:1px solid var(--global-palette6, #718096);border-right:0px solid #f5f5f5;border-bottom:0px solid #f5f5f5;border-left:3px solid #f5f5f5;padding-top:var(--global-kb-spacing-sm, 1.5rem);padding-right:var(--global-kb-spacing-sm, 1.5rem);padding-bottom:var(--global-kb-spacing-sm, 1.5rem);padding-left:var(--global-kb-spacing-sm, 1.5rem);}.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header:hover, \n\t\t\t\tbody:not(.hide-focus-outline) .kt-accordion-id1912_c2fa2c-e7 .kt-blocks-accordion-header:focus-visible{border-top-color:var(--global-palette2, #2B6CB0);border-top-style:solid;border-right-color:var(--global-palette2, #2B6CB0);border-right-style:solid;border-bottom-color:var(--global-palette2, #2B6CB0);border-bottom-style:solid;border-left-color:var(--global-palette2, #2B6CB0);border-left-style:solid;}.kt-accordion-id1912_c2fa2c-e7 .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible,\n\t\t\t\t.kt-accordion-id1912_c2fa2c-e7 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active{border-top:1px solid var(--global-palette6, #718096);border-right:3px solid var(--global-palette7, #EDF2F7);border-bottom:0px solid #f5f5f5;border-left:3px solid var(--global-palette7, #EDF2F7);}}<\/style>\n<div class=\"wp-block-kadence-accordion alignnone\"><div class=\"kt-accordion-wrap kt-accordion-id1912_c2fa2c-e7 kt-accordion-has-6-panes kt-active-pane-5 kt-accordion-block kt-pane-header-alignment-left kt-accodion-icon-style-arrow kt-accodion-icon-side-right\" style=\"max-width:none\"><div class=\"kt-accordion-inner-wrap\" data-allow-multiple-open=\"false\" data-start-open=\"5\">\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-6 kt-pane1912_51e227-ff\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong><strong>A.&nbsp;Organisation,&nbsp;Information,&nbsp;Koordination&nbsp;und&nbsp;Dokumentation<\/strong><\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n\n    \n    \n    \n        <meta charset=\"UTF-8\"\/><meta name=\"viewport\" content=\"width=device-width, initial-scale=1.0\"\/><title>LM.BIM Codes<\/title><style>table {\n                font-family: 'Open Sans', sans-serif;\n                font-size: var(--global-kb-font-size-md);\n                width: 100%;\n                max-width: var(--global-content-width);\n                border-collapse: collapse;\n                border-spacing: 0;\n                background-color: var(--global-palette9);\n                color: var(--global-palette3);\n            }\n            thead {\n                background-color: var(--global-palette7);\n                color: var(--global-palette3);\n            }\n            thead tr {\n                border-bottom: 5px solid white;\n            }\n            th, td {\n                padding: 10px;\n                text-align: left;\n            }\n            tbody tr {\n                border-bottom: 5px solid white;\n                font-size: 13.5px;\n            }\n            td {\n                background-color: var(--global-palette8);\n                font-size: 13.5px;\n            }\n            td a {\n                text-decoration: none;\n                color: var(--global-palette-highlight);\n                font-family: 'Open Sans', sans-serif;\n                font-size: 13.5px;\n            }\n        <\/style><table class=\"wp-block-kadence-table\"><thead><tr><th style=\"width: 20%;\">LM.BIM Code<\/th><th>Grundleistung &#038; Optionale Leistung<\/th><\/tr><\/thead><tbody><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-2.A.1\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-2.A.1<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">Pr\u00fcfung und Freigabe des durch die BGK fortgeschriebenen BAP bzw. zusammenfassenden Dokuments (z.B. Projekthandbuch) \n            <\/td><\/tr><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-2.A.2\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-2.A.2<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">Teilnahme an BIM-Besprechungen des AG inkl. Dokumentation\n            <\/td><\/tr><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-2.A.3\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-2.A.3<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">\u00dcberwachen der Leistungen der BPS auf Einhaltung der Vorgaben gem\u00e4\u00df AIA und BAP, bzw. dem Projekthandbuch \n            <\/td><\/tr><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-2.A.4\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-2.A.4<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">Regelm\u00e4\u00dfige Berichterstattung \u00fcber Projektstatus hinsichtlich BIM an den AG \n            <\/td><\/tr><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-2.A.5-O\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-2.A.5-O (optional)<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">Unterst\u00fctzung der Projektleitung im Projektverlauf (Umfang ist vor der Vergabe zu konkretisieren)\n            <\/td><\/tr><\/tbody><\/table>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-1 kt-pane1912_081d67-8d\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong><strong>B.&nbsp;<\/strong><\/strong><strong><strong>Qualit\u00e4ten&nbsp;und&nbsp;Quantit\u00e4ten<\/strong><\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211;<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-2 kt-pane1912_93ddf1-a0\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong>C.&nbsp;Kosten&nbsp;und&nbsp;Finanzierung<\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211;<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-3 kt-pane1912_7afda1-4f\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong>D.&nbsp;Termine&nbsp;und&nbsp;Kapazit\u00e4ten<\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211;<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-4 kt-pane1912_50ab2b-c0\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong>E. Vertr\u00e4ge&nbsp;und&nbsp;Versicherungen<\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211;<\/p>\n<\/div><\/div><\/div>\n<\/div><\/div><\/div>\n\n<p class=\"has-theme-palette-7-background-color has-background wp-block-paragraph\" style=\"border-style:none;border-width:0px;padding-right:var(--wp--preset--spacing--20);padding-left:var(--wp--preset--spacing--20)\">Publication from Eichler, C.C., Gaudart, D., Holzer, R., Hohenegger, M., Krones, T., Krischmann, T., Malzer, W.: <em>LM.BIM 2025 &#8211; BIM-Leistungsbilder<\/em>. Edition 2025. Mironde-Verlag, Niederfrohna, 2025.<br\/>URL: <em>Not yet available<\/em><br\/>Status: 04.01.2025  <\/p>\n","protected":false},"featured_media":0,"parent":4397,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","_is_vendor_doc":"0","footnotes":""},"doc_tag":[102,31],"class_list":["post-4351","docs","type-docs","status-publish","hentry","doc_tag-leistungsbild","doc_tag-rollen"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"This article contains the service profile of BIM project management (BPL) for the project phase planning phase (corresponds to LPH2 - preliminary design, LPH3 - design planning, LPH4 - submission planning to LPH5 - implementation planning according to LM.OA.BIM) and is basically based on the specifications of openBIM project implementation. Definition of the service profile\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"jdsuO6IAKQT7AdnTfoa5E7sI8v5dqiUpWHZIcfLmyLg\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"openBIM KnowledgeBase \u2023 Die Plattform f\u00fcr openBIM Wissen\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Planning phase \u2023 openBIM KnowledgeBase\" \/>\n\t\t<meta property=\"og:description\" content=\"This article contains the service profile of BIM project management (BPL) for the project phase planning phase (corresponds to LPH2 - preliminary design, LPH3 - design planning, LPH4 - submission planning to LPH5 - implementation planning according to LM.OA.BIM) and is basically based on the specifications of openBIM project implementation. Definition of the service profile\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-06T03:32:51+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-03-15T13:11:43+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Planning phase \u2023 openBIM KnowledgeBase\" \/>\n\t\t<meta name=\"twitter:description\" content=\"This article contains the service profile of BIM project management (BPL) for the project phase planning phase (corresponds to LPH2 - preliminary design, LPH3 - design planning, LPH4 - submission planning to LPH5 - implementation planning according to LM.OA.BIM) and is basically based on the specifications of openBIM project implementation. Definition of the service profile\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/planning-phase-2\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#listItem\",\"position\":1,\"name\":\"KnowledgeBase\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/doc-tag\\\/rollen\\\/#listItem\",\"name\":\"Rollen\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/doc-tag\\\/rollen\\\/#listItem\",\"position\":2,\"name\":\"Rollen\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/doc-tag\\\/rollen\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/#listItem\",\"name\":\"BIM-scope of works LM.BIM 2025\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#listItem\",\"name\":\"KnowledgeBase\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/#listItem\",\"position\":3,\"name\":\"BIM-scope of works LM.BIM 2025\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/#listItem\",\"name\":\"BIM project management (BPL)\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/doc-tag\\\/rollen\\\/#listItem\",\"name\":\"Rollen\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/#listItem\",\"position\":4,\"name\":\"BIM project management (BPL)\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/planning-phase-2\\\/#listItem\",\"name\":\"Planning phase\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/#listItem\",\"name\":\"BIM-scope of works LM.BIM 2025\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/planning-phase-2\\\/#listItem\",\"position\":5,\"name\":\"Planning phase\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/#listItem\",\"name\":\"BIM project management (BPL)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#organization\",\"name\":\"buildingSMART Austria\",\"description\":\"buildingSMART Austria ist eine offene Plattform, deren Ziel die Entwicklung digitaler L\\u00f6sungen in allen Sektoren des Built Environments, also \\u00fcber die gesamte Wertsch\\u00f6pfungskette und den gesamten Lebenszyklus hinweg, ist.\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"email\":\"alfred.waschl@buildingsmart.co.at\",\"telephone\":\"+43676840350100\",\"foundingDate\":\"2024-06-05\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/BuildingSMART_CMYK_Austria.jpeg\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/planning-phase-2\\\/#organizationLogo\",\"width\":2308,\"height\":425,\"caption\":\"BuildingSMART_CMYK_Austria\"},\"image\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/planning-phase-2\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/buildingsmart-austria\\\/\"],\"address\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#postaladdress\",\"@type\":\"PostalAddress\",\"streetAddress\":\"Eschenbachgasse 9\",\"postalCode\":\"1010\",\"addressLocality\":\"Wien\",\"addressCountry\":\"AT\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/planning-phase-2\\\/#webpage\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/planning-phase-2\\\/\",\"name\":\"Planning phase \\u2023 openBIM KnowledgeBase\",\"description\":\"This article contains the service profile of BIM project management (BPL) for the project phase planning phase (corresponds to LPH2 - preliminary design, LPH3 - design planning, LPH4 - submission planning to LPH5 - implementation planning according to LM.OA.BIM) and is basically based on the specifications of openBIM project implementation. Definition of the service profile\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/planning-phase-2\\\/#breadcrumblist\"},\"datePublished\":\"2024-02-06T04:32:51+01:00\",\"dateModified\":\"2025-03-15T14:11:43+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"name\":\"openBIM KnowledgeBase\",\"alternateName\":\"openBIM Wissensplattform\",\"description\":\"Die Plattform f\\u00fcr openBIM Wissen\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Planning phase \u2023 openBIM KnowledgeBase<\/title>\n\n","aioseo_head_json":{"title":"Planning phase \u2023 openBIM KnowledgeBase","description":"This article contains the service profile of BIM project management (BPL) for the project phase planning phase (corresponds to LPH2 - preliminary design, LPH3 - design planning, LPH4 - submission planning to LPH5 - implementation planning according to LM.OA.BIM) and is basically based on the specifications of openBIM project implementation. Definition of the service profile","canonical_url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"jdsuO6IAKQT7AdnTfoa5E7sI8v5dqiUpWHZIcfLmyLg","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/#listItem","position":1,"name":"KnowledgeBase","item":"https:\/\/openbim-knowledgebase.org\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/#listItem","name":"Rollen"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/#listItem","position":2,"name":"Rollen","item":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#listItem","name":"BIM-scope of works LM.BIM 2025"},"previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/#listItem","name":"KnowledgeBase"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#listItem","position":3,"name":"BIM-scope of works LM.BIM 2025","item":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/#listItem","name":"BIM project management (BPL)"},"previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/#listItem","name":"Rollen"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/#listItem","position":4,"name":"BIM project management (BPL)","item":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/#listItem","name":"Planning phase"},"previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#listItem","name":"BIM-scope of works LM.BIM 2025"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/#listItem","position":5,"name":"Planning phase","previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/#listItem","name":"BIM project management (BPL)"}}]},{"@type":"Organization","@id":"https:\/\/openbim-knowledgebase.org\/en\/#organization","name":"buildingSMART Austria","description":"buildingSMART Austria ist eine offene Plattform, deren Ziel die Entwicklung digitaler L\u00f6sungen in allen Sektoren des Built Environments, also \u00fcber die gesamte Wertsch\u00f6pfungskette und den gesamten Lebenszyklus hinweg, ist.","url":"https:\/\/openbim-knowledgebase.org\/en\/","email":"alfred.waschl@buildingsmart.co.at","telephone":"+43676840350100","foundingDate":"2024-06-05","logo":{"@type":"ImageObject","url":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2023\/12\/BuildingSMART_CMYK_Austria.jpeg","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/#organizationLogo","width":2308,"height":425,"caption":"BuildingSMART_CMYK_Austria"},"image":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/#organizationLogo"},"sameAs":["https:\/\/www.linkedin.com\/company\/buildingsmart-austria\/"],"address":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#postaladdress","@type":"PostalAddress","streetAddress":"Eschenbachgasse 9","postalCode":"1010","addressLocality":"Wien","addressCountry":"AT"}},{"@type":"WebPage","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/#webpage","url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/","name":"Planning phase \u2023 openBIM KnowledgeBase","description":"This article contains the service profile of BIM project management (BPL) for the project phase planning phase (corresponds to LPH2 - preliminary design, LPH3 - design planning, LPH4 - submission planning to LPH5 - implementation planning according to LM.OA.BIM) and is basically based on the specifications of openBIM project implementation. Definition of the service profile","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#website"},"breadcrumb":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/#breadcrumblist"},"datePublished":"2024-02-06T04:32:51+01:00","dateModified":"2025-03-15T14:11:43+01:00"},{"@type":"WebSite","@id":"https:\/\/openbim-knowledgebase.org\/en\/#website","url":"https:\/\/openbim-knowledgebase.org\/en\/","name":"openBIM KnowledgeBase","alternateName":"openBIM Wissensplattform","description":"Die Plattform f\u00fcr openBIM Wissen","inLanguage":"en-US","publisher":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"openBIM KnowledgeBase \u2023 Die Plattform f\u00fcr openBIM Wissen","og:type":"article","og:title":"Planning phase \u2023 openBIM KnowledgeBase","og:description":"This article contains the service profile of BIM project management (BPL) for the project phase planning phase (corresponds to LPH2 - preliminary design, LPH3 - design planning, LPH4 - submission planning to LPH5 - implementation planning according to LM.OA.BIM) and is basically based on the specifications of openBIM project implementation. Definition of the service profile","og:url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/","og:image":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png","og:image:secure_url":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png","og:image:width":1200,"og:image:height":630,"article:published_time":"2024-02-06T03:32:51+00:00","article:modified_time":"2025-03-15T13:11:43+00:00","twitter:card":"summary_large_image","twitter:title":"Planning phase \u2023 openBIM KnowledgeBase","twitter:description":"This article contains the service profile of BIM project management (BPL) for the project phase planning phase (corresponds to LPH2 - preliminary design, LPH3 - design planning, LPH4 - submission planning to LPH5 - implementation planning according to LM.OA.BIM) and is basically based on the specifications of openBIM project implementation. Definition of the service profile","twitter:image":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png"},"aioseo_meta_data":{"post_id":"4351","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"planning phase","score":0,"analysis":[]},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2025-10-17 13:19:11","breadcrumb_settings":null,"limit_modified_date":false,"reviewed_by":null,"open_ai":"{\"title\":{\"suggestions\":[],\"usage\":0},\"description\":{\"suggestions\":[],\"usage\":0}}","ai":null,"created":"2025-03-15 13:11:29","updated":"2026-04-15 07:16:01","focus_keyword":"planning phase","additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/en\/\" title=\"KnowledgeBase\">KnowledgeBase<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/\" title=\"Rollen\">Rollen<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/\" title=\"BIM-scope of works LM.BIM 2025\">BIM-scope of works LM.BIM 2025<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/\" title=\"BIM project management (BPL)\">BIM project management (BPL)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\tPlanning phase\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"KnowledgeBase","link":"https:\/\/openbim-knowledgebase.org\/en\/"},{"label":"Rollen","link":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/"},{"label":"BIM-scope of works LM.BIM 2025","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/"},{"label":"BIM project management (BPL)","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/"},{"label":"Planning phase","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/planning-phase-2\/"}],"taxonomy_info":{"doc_tag":[{"value":102,"label":"Leistungsbild"},{"value":31,"label":"Rollen"}]},"featured_image_src_large":false,"author_info":[],"comment_info":0,"comment_count":0,"_links":{"self":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4351","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/types\/docs"}],"replies":[{"embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/comments?post=4351"}],"version-history":[{"count":0,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4351\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4397"}],"next":[{"title":"Procurement phase","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/procurement-phase-2\/","href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4348"}],"prev":[{"title":"Project initiation","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/project-initiation-2\/","href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4355"}],"wp:attachment":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/media?parent=4351"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/doc_tag?post=4351"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}