{"id":4342,"date":"2024-02-06T04:57:56","date_gmt":"2024-02-06T03:57:56","guid":{"rendered":"https:\/\/openbim-knowledgebase.org\/docs\/construction-phase\/"},"modified":"2025-03-15T14:11:43","modified_gmt":"2025-03-15T13:11:43","slug":"construction-phase","status":"publish","type":"docs","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/","title":{"rendered":"Construction phase"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">This article contains the <strong>BIM project management (BPL)<\/strong> service profile for the construction phase (corresponds to LPH7 &#8211; construction supervision and LPH8 &#8211; local construction supervision and documentation in accordance with <a href=\"https:\/\/www.arching.at\/fileadmin\/user_upload\/redakteure\/LM_VM_2014\/LM_Objektplanung_Arch_BIM_.pdf\">LM.OA.BIM<\/a>) and is fundamentally based on the <a href=\"https:\/\/openbim-knowledgebase.org\/docs\/bimcert-lehrbuch-2024\/kapitel-4-bim-projektdurchfuehrung\/\">openBIM project implementation<\/a> specifications.<\/p>\n<style>.wp-block-kadence-advancedheading.kt-adv-heading1930_1c9026-0b, .wp-block-kadence-advancedheading.kt-adv-heading1930_1c9026-0b[data-kb-block=\"kb-adv-heading1930_1c9026-0b\"]{margin-top:0px;margin-bottom:var(--global-kb-spacing-sm, 1.5rem);text-align:left;font-size:var(--global-kb-font-size-lg, 2rem);line-height:1.2em;font-style:normal;}.wp-block-kadence-advancedheading.kt-adv-heading1930_1c9026-0b mark.kt-highlight, .wp-block-kadence-advancedheading.kt-adv-heading1930_1c9026-0b[data-kb-block=\"kb-adv-heading1930_1c9026-0b\"] mark.kt-highlight{font-style:normal;color:#f76a0c;-webkit-box-decoration-break:clone;box-decoration-break:clone;padding-top:0px;padding-right:0px;padding-bottom:0px;padding-left:0px;}.wp-block-kadence-advancedheading.kt-adv-heading1930_1c9026-0b img.kb-inline-image, .wp-block-kadence-advancedheading.kt-adv-heading1930_1c9026-0b[data-kb-block=\"kb-adv-heading1930_1c9026-0b\"] img.kb-inline-image{width:150px;vertical-align:baseline;}<\/style>\n<h2 class=\"kt-adv-heading1930_1c9026-0b wp-block-kadence-advancedheading has-theme-palette-3-color has-text-color\" data-kb-block=\"kb-adv-heading1930_1c9026-0b\">Definition of the service profile<\/h2>\n\n<p class=\"has--font-size wp-block-paragraph\">The LM.BIM 2025 service profile divides the services into <strong><a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#Erlaeuterung-optionale-Leistungen\" data-id=\"1746\" data-type=\"docs\">basic services<\/a><\/strong> and <strong><a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#Erlaeuterung-optionale-Leistungen\">optional services<\/a><\/strong> &#8211; These are summarized in one column. Optional services are declared using the <strong><a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#Erl%C3%A4uterung-LMBIM-Code\">LM.BIM code<\/a><\/strong> with the attached note &#8220;optional&#8221;. <\/p>\n<style>.kt-accordion-id1930_4c9892-38 .kt-accordion-inner-wrap{column-gap:var(--global-kb-gap-md, 2rem);row-gap:12px;}.kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner{border-top:0px solid transparent;border-right:0px solid transparent;border-bottom:0px solid var(--global-palette5, #4A5568);border-left:0px solid transparent;background:var(--global-palette8, #F7FAFC);padding-top:0px;padding-right:0px;padding-bottom:0px;padding-left:0px;}.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header{border-top:1px solid var(--global-palette6, #718096);border-right:0px solid #f5f5f5;border-bottom:0px solid #f5f5f5;border-left:3px solid #f5f5f5;border-top-left-radius:0px;border-top-right-radius:0px;border-bottom-right-radius:0px;border-bottom-left-radius:0px;background:var(--global-palette7, #EDF2F7);color:var(--global-palette3, #1A202C);padding-top:var(--global-kb-spacing-xxs, 0.5rem);padding-right:0px;padding-bottom:var(--global-kb-spacing-xxs, 0.5rem);padding-left:0px;}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle )  > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle )  > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette6, #718096);}.kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner, .kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner h1, .kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner h2, .kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner h3, .kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner h4, .kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner h5, .kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner h6{color:var(--global-palette3, #1A202C);}.kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner a{color:var(--global-palette1, #3182CE);}.kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner a:hover{color:var(--global-palette2, #2B6CB0);}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-icon-trigger{background:var(--global-palette6, #718096);}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette7, #EDF2F7);}.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header:hover, \n\t\t\t\tbody:not(.hide-focus-outline) .kt-accordion-id1930_4c9892-38 .kt-blocks-accordion-header:focus-visible{color:var(--global-palette3, #1A202C);background:var(--global-palette2, #2B6CB0);border-top-color:var(--global-palette2, #2B6CB0);border-top-style:solid;border-right-color:var(--global-palette2, #2B6CB0);border-right-style:solid;border-bottom-color:var(--global-palette2, #2B6CB0);border-bottom-style:solid;border-left-color:var(--global-palette2, #2B6CB0);border-left-style:solid;}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger:before, body:not(.hide-focus-outline) .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle ) .kt-blocks-accordion--visible .kt-blocks-accordion-icon-trigger:after, body:not(.hide-focus-outline) .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle ) .kt-blocks-accordion-header:focus-visible .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette5, #4A5568);}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger, body:not(.hide-focus-outline) .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible .kt-blocks-accordion-icon-trigger{background:var(--global-palette5, #4A5568);}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:hover .kt-blocks-accordion-icon-trigger:before, body:not(.hide-focus-outline) .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible .kt-blocks-accordion-icon-trigger:after, body:not(.hide-focus-outline) .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette2, #2B6CB0);}.kt-accordion-id1930_4c9892-38 .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible,\n\t\t\t\t.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active{color:var(--global-palette3, #1A202C);background:var(--global-palette7, #EDF2F7);border-top:1px solid var(--global-palette6, #718096);border-right:3px solid var(--global-palette7, #EDF2F7);border-bottom:0px solid #f5f5f5;border-left:3px solid var(--global-palette7, #EDF2F7);}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle )  > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basiccircle ):not( .kt-accodion-icon-style-xclosecircle ):not( .kt-accodion-icon-style-arrowcircle )  > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette6, #718096);}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger{background:var(--global-palette6, #718096);}.kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger:after, .kt-accordion-id1930_4c9892-38:not( .kt-accodion-icon-style-basic ):not( .kt-accodion-icon-style-xclose ):not( .kt-accodion-icon-style-arrow ) .kt-blocks-accordion-header.kt-accordion-panel-active .kt-blocks-accordion-icon-trigger:before{background:var(--global-palette7, #EDF2F7);}@media all and (max-width: 1024px){.kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner{border-top:0px solid transparent;border-right:0px solid transparent;border-bottom:0px solid var(--global-palette5, #4A5568);border-left:0px solid transparent;}}@media all and (max-width: 1024px){.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header{border-top:1px solid var(--global-palette6, #718096);border-right:0px solid #f5f5f5;border-bottom:0px solid #f5f5f5;border-left:3px solid #f5f5f5;}}@media all and (max-width: 1024px){.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header:hover, \n\t\t\t\tbody:not(.hide-focus-outline) .kt-accordion-id1930_4c9892-38 .kt-blocks-accordion-header:focus-visible{border-top-color:var(--global-palette2, #2B6CB0);border-top-style:solid;border-right-color:var(--global-palette2, #2B6CB0);border-right-style:solid;border-bottom-color:var(--global-palette2, #2B6CB0);border-bottom-style:solid;border-left-color:var(--global-palette2, #2B6CB0);border-left-style:solid;}}@media all and (max-width: 1024px){.kt-accordion-id1930_4c9892-38 .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible,\n\t\t\t\t.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active{border-top:1px solid var(--global-palette6, #718096);border-right:3px solid var(--global-palette7, #EDF2F7);border-bottom:0px solid #f5f5f5;border-left:3px solid var(--global-palette7, #EDF2F7);}}@media all and (max-width: 767px){.kt-accordion-id1930_4c9892-38 .kt-accordion-inner-wrap{display:block;}.kt-accordion-id1930_4c9892-38 .kt-accordion-inner-wrap .kt-accordion-pane:not(:first-child){margin-top:12px;}.kt-accordion-id1930_4c9892-38 .kt-accordion-panel-inner{border-top:0px solid transparent;border-right:0px solid transparent;border-bottom:0px solid var(--global-palette5, #4A5568);border-left:0px solid transparent;padding-top:0px;padding-right:var(--global-kb-spacing-md, 2rem);padding-bottom:var(--global-kb-spacing-md, 2rem);padding-left:var(--global-kb-spacing-md, 2rem);}.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header{border-top:1px solid var(--global-palette6, #718096);border-right:0px solid #f5f5f5;border-bottom:0px solid #f5f5f5;border-left:3px solid #f5f5f5;padding-top:var(--global-kb-spacing-sm, 1.5rem);padding-right:var(--global-kb-spacing-sm, 1.5rem);padding-bottom:var(--global-kb-spacing-sm, 1.5rem);padding-left:var(--global-kb-spacing-sm, 1.5rem);}.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header:hover, \n\t\t\t\tbody:not(.hide-focus-outline) .kt-accordion-id1930_4c9892-38 .kt-blocks-accordion-header:focus-visible{border-top-color:var(--global-palette2, #2B6CB0);border-top-style:solid;border-right-color:var(--global-palette2, #2B6CB0);border-right-style:solid;border-bottom-color:var(--global-palette2, #2B6CB0);border-bottom-style:solid;border-left-color:var(--global-palette2, #2B6CB0);border-left-style:solid;}.kt-accordion-id1930_4c9892-38 .kt-accordion-header-wrap .kt-blocks-accordion-header:focus-visible,\n\t\t\t\t.kt-accordion-id1930_4c9892-38 > .kt-accordion-inner-wrap > .wp-block-kadence-pane > .kt-accordion-header-wrap > .kt-blocks-accordion-header.kt-accordion-panel-active{border-top:1px solid var(--global-palette6, #718096);border-right:3px solid var(--global-palette7, #EDF2F7);border-bottom:0px solid #f5f5f5;border-left:3px solid var(--global-palette7, #EDF2F7);}}<\/style>\n<div class=\"wp-block-kadence-accordion alignnone\"><div class=\"kt-accordion-wrap kt-accordion-id1930_4c9892-38 kt-accordion-has-6-panes kt-active-pane-5 kt-accordion-block kt-pane-header-alignment-left kt-accodion-icon-style-arrow kt-accodion-icon-side-right\" style=\"max-width:none\"><div class=\"kt-accordion-inner-wrap\" data-allow-multiple-open=\"false\" data-start-open=\"5\">\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-6 kt-pane1930_33edee-eb\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong><strong>A.&nbsp;Organisation,&nbsp;Information,&nbsp;Koordination&nbsp;und&nbsp;Dokumentation<\/strong><\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n\n    \n    \n    \n        <meta charset=\"UTF-8\"\/><meta name=\"viewport\" content=\"width=device-width, initial-scale=1.0\"\/><title>LM.BIM Codes<\/title><style>table {\n                font-family: 'Open Sans', sans-serif;\n                font-size: var(--global-kb-font-size-md);\n                width: 100%;\n                max-width: var(--global-content-width);\n                border-collapse: collapse;\n                border-spacing: 0;\n                background-color: var(--global-palette9);\n                color: var(--global-palette3);\n            }\n            thead {\n                background-color: var(--global-palette7);\n                color: var(--global-palette3);\n            }\n            thead tr {\n                border-bottom: 5px solid white;\n            }\n            th, td {\n                padding: 10px;\n                text-align: left;\n            }\n            tbody tr {\n                border-bottom: 5px solid white;\n                font-size: 13.5px;\n            }\n            td {\n                background-color: var(--global-palette8);\n                font-size: 13.5px;\n            }\n            td a {\n                text-decoration: none;\n                color: var(--global-palette-highlight);\n                font-family: 'Open Sans', sans-serif;\n                font-size: 13.5px;\n            }\n        <\/style><table class=\"wp-block-kadence-table\"><thead><tr><th style=\"width: 20%;\">LM.BIM Code<\/th><th>Grundleistung &#038; Optionale Leistung<\/th><\/tr><\/thead><tbody><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-4.A.1\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-4.A.1<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">Pr\u00fcfung und Freigabe des durch die BGK fortgeschriebenen BAP bzw. zusammenfassenden Dokuments (z.B. Projekthandbuch) \n            <\/td><\/tr><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-4.A.2\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-4.A.2<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">Teilnahme an BIM-Besprechungen des AG inkl. Dokumentation\n            <\/td><\/tr><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-4.A.3\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-4.A.3<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">\u00dcberwachen der Leistungen der BPS auf Einhaltung der Vorgaben gem\u00e4\u00df AIA und BAP bzw. dem Projekthandbuch\n            <\/td><\/tr><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-4.A.4\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-4.A.4<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">Regelm\u00e4\u00dfige Berichterstattung \u00fcber Projektstatus hinsichtlich BIM an den AG \n            <\/td><\/tr><tr style=\"border-bottom: 5px solid white; font-size: 13.5px;\"><td style=\"padding: 10px; background-color: var(--global-palette8); font-size: 13.5px;\"><a href=\"#BPL-4.A.5-O\" style=\"text-decoration: none; color: var(--global-palette-highlight); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\"><strong>BPL-4.A.5-O (optional)<\/strong><\/a><\/td><td style=\"padding: 10px; background-color: var(--global-palette8); font-family: 'Open Sans', sans-serif; font-size: 13.5px;\">Unterst\u00fctzung der Projektleitung im Projektverlauf (Umfang ist vor der Vergabe zu konkretisieren)\n            <\/td><\/tr><\/tbody><\/table>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-1 kt-pane1930_110a46-39\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong><strong>B.&nbsp;<\/strong><\/strong><strong><strong>Qualit\u00e4ten&nbsp;und&nbsp;Quantit\u00e4ten<\/strong><\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211;<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-2 kt-pane1930_5bf57c-e4\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong>C.&nbsp;Kosten&nbsp;und&nbsp;Finanzierung<\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211;<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-3 kt-pane1930_d912e7-6b\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong>D.&nbsp;Termine&nbsp;und&nbsp;Kapazit\u00e4ten<\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211;<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-kadence-pane kt-accordion-pane kt-accordion-pane-4 kt-pane1930_d0956c-a4\"><h4 class=\"kt-accordion-header-wrap\"><button class=\"kt-blocks-accordion-header kt-acccordion-button-label-show\" type=\"button\"><span class=\"kt-blocks-accordion-title-wrap\"><span class=\"kt-blocks-accordion-title\"><strong>E. Vertr\u00e4ge&nbsp;und&nbsp;Versicherungen<\/strong><\/span><\/span><span class=\"kt-blocks-accordion-icon-trigger\"><\/span><\/button><\/h4><div class=\"kt-accordion-panel kt-accordion-panel-hidden\"><div class=\"kt-accordion-panel-inner\">\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211;<\/p>\n<\/div><\/div><\/div>\n<\/div><\/div><\/div>\n\n<p class=\"has-theme-palette-7-background-color has-background wp-block-paragraph\" style=\"border-style:none;border-width:0px;padding-right:var(--wp--preset--spacing--20);padding-left:var(--wp--preset--spacing--20)\">Publication from Eichler, C.C., Gaudart, D., Holzer, R., Hohenegger, M., Krones, T., Krischmann, T., Malzer, W.: <em>LM.BIM 2025 &#8211; BIM-Leistungsbilder<\/em>. Edition 2025. Mironde-Verlag, Niederfrohna, 2025.<br\/>URL: <em>Not yet available<\/em><br\/>Status: 04.01.2025  <\/p>\n","protected":false},"featured_media":0,"parent":4397,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","_is_vendor_doc":"0","footnotes":""},"doc_tag":[102,31],"class_list":["post-4342","docs","type-docs","status-publish","hentry","doc_tag-leistungsbild","doc_tag-rollen"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"This article contains the BIM project management (BPL) service profile for the construction phase (corresponds to LPH7 - construction supervision and LPH8 - local construction supervision and documentation in accordance with LM.OA.BIM) and is fundamentally based on the openBIM project implementation specifications. Definition of the service profile The LM.BIM 2025 service profile divides the services\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"jdsuO6IAKQT7AdnTfoa5E7sI8v5dqiUpWHZIcfLmyLg\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"openBIM KnowledgeBase \u2023 Die Plattform f\u00fcr openBIM Wissen\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Construction phase \u2023 openBIM KnowledgeBase\" \/>\n\t\t<meta property=\"og:description\" content=\"This article contains the BIM project management (BPL) service profile for the construction phase (corresponds to LPH7 - construction supervision and LPH8 - local construction supervision and documentation in accordance with LM.OA.BIM) and is fundamentally based on the openBIM project implementation specifications. Definition of the service profile The LM.BIM 2025 service profile divides the services\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-06T03:57:56+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-03-15T13:11:43+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Construction phase \u2023 openBIM KnowledgeBase\" \/>\n\t\t<meta name=\"twitter:description\" content=\"This article contains the BIM project management (BPL) service profile for the construction phase (corresponds to LPH7 - construction supervision and LPH8 - local construction supervision and documentation in accordance with LM.OA.BIM) and is fundamentally based on the openBIM project implementation specifications. Definition of the service profile The LM.BIM 2025 service profile divides the services\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/construction-phase\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#listItem\",\"position\":1,\"name\":\"KnowledgeBase\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/doc-tag\\\/rollen\\\/#listItem\",\"name\":\"Rollen\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/doc-tag\\\/rollen\\\/#listItem\",\"position\":2,\"name\":\"Rollen\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/doc-tag\\\/rollen\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/#listItem\",\"name\":\"BIM-scope of works LM.BIM 2025\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#listItem\",\"name\":\"KnowledgeBase\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/#listItem\",\"position\":3,\"name\":\"BIM-scope of works LM.BIM 2025\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/#listItem\",\"name\":\"BIM project management (BPL)\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/doc-tag\\\/rollen\\\/#listItem\",\"name\":\"Rollen\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/#listItem\",\"position\":4,\"name\":\"BIM project management (BPL)\",\"item\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/construction-phase\\\/#listItem\",\"name\":\"Construction phase\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/#listItem\",\"name\":\"BIM-scope of works LM.BIM 2025\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/construction-phase\\\/#listItem\",\"position\":5,\"name\":\"Construction phase\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/#listItem\",\"name\":\"BIM project management (BPL)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#organization\",\"name\":\"buildingSMART Austria\",\"description\":\"buildingSMART Austria ist eine offene Plattform, deren Ziel die Entwicklung digitaler L\\u00f6sungen in allen Sektoren des Built Environments, also \\u00fcber die gesamte Wertsch\\u00f6pfungskette und den gesamten Lebenszyklus hinweg, ist.\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"email\":\"alfred.waschl@buildingsmart.co.at\",\"telephone\":\"+43676840350100\",\"foundingDate\":\"2024-06-05\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/BuildingSMART_CMYK_Austria.jpeg\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/construction-phase\\\/#organizationLogo\",\"width\":2308,\"height\":425,\"caption\":\"BuildingSMART_CMYK_Austria\"},\"image\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/construction-phase\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/buildingsmart-austria\\\/\"],\"address\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#postaladdress\",\"@type\":\"PostalAddress\",\"streetAddress\":\"Eschenbachgasse 9\",\"postalCode\":\"1010\",\"addressLocality\":\"Wien\",\"addressCountry\":\"AT\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/construction-phase\\\/#webpage\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/construction-phase\\\/\",\"name\":\"Construction phase \\u2023 openBIM KnowledgeBase\",\"description\":\"This article contains the BIM project management (BPL) service profile for the construction phase (corresponds to LPH7 - construction supervision and LPH8 - local construction supervision and documentation in accordance with LM.OA.BIM) and is fundamentally based on the openBIM project implementation specifications. Definition of the service profile The LM.BIM 2025 service profile divides the services\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/docs\\\/bim-performance-diagrams-lm-bim-2025\\\/bim-project-management-bpl\\\/construction-phase\\\/#breadcrumblist\"},\"datePublished\":\"2024-02-06T04:57:56+01:00\",\"dateModified\":\"2025-03-15T14:11:43+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/\",\"name\":\"openBIM KnowledgeBase\",\"alternateName\":\"openBIM Wissensplattform\",\"description\":\"Die Plattform f\\u00fcr openBIM Wissen\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/openbim-knowledgebase.org\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Construction phase \u2023 openBIM KnowledgeBase<\/title>\n\n","aioseo_head_json":{"title":"Construction phase \u2023 openBIM KnowledgeBase","description":"This article contains the BIM project management (BPL) service profile for the construction phase (corresponds to LPH7 - construction supervision and LPH8 - local construction supervision and documentation in accordance with LM.OA.BIM) and is fundamentally based on the openBIM project implementation specifications. Definition of the service profile The LM.BIM 2025 service profile divides the services","canonical_url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"jdsuO6IAKQT7AdnTfoa5E7sI8v5dqiUpWHZIcfLmyLg","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/#listItem","position":1,"name":"KnowledgeBase","item":"https:\/\/openbim-knowledgebase.org\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/#listItem","name":"Rollen"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/#listItem","position":2,"name":"Rollen","item":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#listItem","name":"BIM-scope of works LM.BIM 2025"},"previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/#listItem","name":"KnowledgeBase"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#listItem","position":3,"name":"BIM-scope of works LM.BIM 2025","item":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/#listItem","name":"BIM project management (BPL)"},"previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/#listItem","name":"Rollen"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/#listItem","position":4,"name":"BIM project management (BPL)","item":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/","nextItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/#listItem","name":"Construction phase"},"previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/#listItem","name":"BIM-scope of works LM.BIM 2025"}},{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/#listItem","position":5,"name":"Construction phase","previousItem":{"@type":"ListItem","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/#listItem","name":"BIM project management (BPL)"}}]},{"@type":"Organization","@id":"https:\/\/openbim-knowledgebase.org\/en\/#organization","name":"buildingSMART Austria","description":"buildingSMART Austria ist eine offene Plattform, deren Ziel die Entwicklung digitaler L\u00f6sungen in allen Sektoren des Built Environments, also \u00fcber die gesamte Wertsch\u00f6pfungskette und den gesamten Lebenszyklus hinweg, ist.","url":"https:\/\/openbim-knowledgebase.org\/en\/","email":"alfred.waschl@buildingsmart.co.at","telephone":"+43676840350100","foundingDate":"2024-06-05","logo":{"@type":"ImageObject","url":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2023\/12\/BuildingSMART_CMYK_Austria.jpeg","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/#organizationLogo","width":2308,"height":425,"caption":"BuildingSMART_CMYK_Austria"},"image":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/#organizationLogo"},"sameAs":["https:\/\/www.linkedin.com\/company\/buildingsmart-austria\/"],"address":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#postaladdress","@type":"PostalAddress","streetAddress":"Eschenbachgasse 9","postalCode":"1010","addressLocality":"Wien","addressCountry":"AT"}},{"@type":"WebPage","@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/#webpage","url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/","name":"Construction phase \u2023 openBIM KnowledgeBase","description":"This article contains the BIM project management (BPL) service profile for the construction phase (corresponds to LPH7 - construction supervision and LPH8 - local construction supervision and documentation in accordance with LM.OA.BIM) and is fundamentally based on the openBIM project implementation specifications. Definition of the service profile The LM.BIM 2025 service profile divides the services","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#website"},"breadcrumb":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/#breadcrumblist"},"datePublished":"2024-02-06T04:57:56+01:00","dateModified":"2025-03-15T14:11:43+01:00"},{"@type":"WebSite","@id":"https:\/\/openbim-knowledgebase.org\/en\/#website","url":"https:\/\/openbim-knowledgebase.org\/en\/","name":"openBIM KnowledgeBase","alternateName":"openBIM Wissensplattform","description":"Die Plattform f\u00fcr openBIM Wissen","inLanguage":"en-US","publisher":{"@id":"https:\/\/openbim-knowledgebase.org\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"openBIM KnowledgeBase \u2023 Die Plattform f\u00fcr openBIM Wissen","og:type":"article","og:title":"Construction phase \u2023 openBIM KnowledgeBase","og:description":"This article contains the BIM project management (BPL) service profile for the construction phase (corresponds to LPH7 - construction supervision and LPH8 - local construction supervision and documentation in accordance with LM.OA.BIM) and is fundamentally based on the openBIM project implementation specifications. Definition of the service profile The LM.BIM 2025 service profile divides the services","og:url":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/","og:image":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png","og:image:secure_url":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png","og:image:width":1200,"og:image:height":630,"article:published_time":"2024-02-06T03:57:56+00:00","article:modified_time":"2025-03-15T13:11:43+00:00","twitter:card":"summary_large_image","twitter:title":"Construction phase \u2023 openBIM KnowledgeBase","twitter:description":"This article contains the BIM project management (BPL) service profile for the construction phase (corresponds to LPH7 - construction supervision and LPH8 - local construction supervision and documentation in accordance with LM.OA.BIM) and is fundamentally based on the openBIM project implementation specifications. Definition of the service profile The LM.BIM 2025 service profile divides the services","twitter:image":"https:\/\/openbim-knowledgebase.org\/wp-content\/uploads\/2026\/04\/og-image-openbim-1200x630-1.png"},"aioseo_meta_data":{"post_id":"4342","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"construction phase","score":0,"analysis":[]},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2025-10-17 13:19:14","breadcrumb_settings":null,"limit_modified_date":false,"reviewed_by":null,"open_ai":"{\"title\":{\"suggestions\":[],\"usage\":0},\"description\":{\"suggestions\":[],\"usage\":0}}","ai":null,"created":"2025-03-15 13:11:26","updated":"2026-04-15 07:16:01","focus_keyword":"construction phase","additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/en\/\" title=\"KnowledgeBase\">KnowledgeBase<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/\" title=\"Rollen\">Rollen<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/\" title=\"BIM-scope of works LM.BIM 2025\">BIM-scope of works LM.BIM 2025<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/\" title=\"BIM project management (BPL)\">BIM project management (BPL)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u2023<\/span><span class=\"aioseo-breadcrumb\">\n\tConstruction phase\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"KnowledgeBase","link":"https:\/\/openbim-knowledgebase.org\/en\/"},{"label":"Rollen","link":"https:\/\/openbim-knowledgebase.org\/doc-tag\/rollen\/"},{"label":"BIM-scope of works LM.BIM 2025","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/"},{"label":"BIM project management (BPL)","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/"},{"label":"Construction phase","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/construction-phase\/"}],"taxonomy_info":{"doc_tag":[{"value":102,"label":"Leistungsbild"},{"value":31,"label":"Rollen"}]},"featured_image_src_large":false,"author_info":[],"comment_info":0,"comment_count":0,"_links":{"self":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/types\/docs"}],"replies":[{"embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/comments?post=4342"}],"version-history":[{"count":0,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4342\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4397"}],"next":[{"title":"Handover","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/handover\/","href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4338"}],"prev":[{"title":"Procurement phase","link":"https:\/\/openbim-knowledgebase.org\/en\/docs\/bim-performance-diagrams-lm-bim-2025\/bim-project-management-bpl\/procurement-phase-2\/","href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/docs\/4348"}],"wp:attachment":[{"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/media?parent=4342"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/openbim-knowledgebase.org\/en\/wp-json\/wp\/v2\/doc_tag?post=4342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}