1. Home
  2. /
  3. Docs
  4. /
  5. Standard AIA 2026
  6. /
  7. Chapter 3 – Project...
  8. /
  9. Chapter 3.3 – Proje...

Chapter 3.3 – Project phases

Instructions

The project phases are defined above the rules and regulations. In the set of rules, they serve to provide an overview and, above all, to specify abbreviations for the project phases, as these are often used in the use cases. In this way, the times for the project phases in which the use cases are to be carried out can be determined.

In general, this set of rules does not define the project phases and their time periods; this is still done in the overall project schedule.

Dieser Inhalt ist nur für Abonnenten zugänglich. Hier gehts zur Registrierung.

Publication from Krischmann, T., Malzer, W.: buildingSMART Austria Standard-AIA. Edition 2026.

Download der Standard-AIA nur für Mitglieder

Status: 17.02.2026

Don`t copy text!